Note: placing mouse over photos halts rotation until mouse leaves image.
The final exterior of the new clinic.
Entry to the veterinary clinic
Reception and waiting area
We built the new clinic behind the old clinic.
The new clinic overlooked the old clinic.
We removed the old clinic and donated all salvageable materials.
Medical
Boarding
Exam Room No. 1
Laboratory
Treatment
Operating Room
X-Ray Room
Parvo Isolation Room
Boarding Office
Kennels for Dogs
Cat Condos
Boarding Facilities
Outdoor Exercise Area
Dog Bathing Area
Building Specialties
Energy Efficiency
Central vacuum systems and fire sprinkler system main valve.
One vacuum for the operating tables.
You can take an x-ray.
And view x-ray during dental surgery.
We installed specialized lighting.
The cantilever supports the track lighting.
Thermal bridging eliminated by wrapping the exterior in Owens Corning sheathing.
Radiant barrier decking and sheathing forms a venting space between the rafters.
The "Water Furnace" geothermal HVAC consists of a heat exchanger.
The manifold.
The horizontal loop field.